Portsmouth Master PlanTaintor & Associates is currently assisting the city of Portsmouth, New Hampshire to prepare a new Master Plan to guide the City's growth into the future. Subconsultants for the project include Optimal Solutions (public participation), Bruce C. Mayberry (housing, economic development), and Wilbur Smith Associates (transportation). The project began in January 2003 and is scheduled to be completed in March 2005.Master Plan Documentation and Resource MaterialsThe following documents from the Portsmouth Master Plan are draft products, subject to revision as the project proceeds.Baseline ReportThe first phase of the Master Plan involved assembling and analyzing data on existing conditions and trends. The baseline report, Existing Conditions and Trends, was completed in April 2003. The report's individual chapters may be downloaded by using the following links.
| ||||||||||||||||||||||||
|